EcoSteel MicroHomes can be your…
A NEW PRODUCT BY ECOSTEEL
MicroHomes
Microhomes, also known as tiny homes or Accessory Dwelling Units (ADU’s) are very popular today for many reasons. They provide housing fast, they can provide rental revenue for existing homeowners or a even place for kids or parents to live or stay when in town.

Why Choose a Steel Microhome?
Most of the industry works with what they know – traditional stick-built construction. EcoSteel has designed a premium, eco-friendly and resistant product ready to be assembled by our hand-selected contractor partners. This method gives you a permitted and assembled ADU shell ready for your imaged space!
- Efficient & Fast
Assembled on site in 10 – 14 days. (No current backlog) - Eco-Friendly
Our steel is made with more than 75% recycled materials - Fire-Resistant
Our steel is a non-combustible, fire resistant material and will not feed a fire. - Weather-Resistant
Delivered by EcoSteel & built by our hand selected Partners. We have your full team ready to go. - EcoSteel Delivers!
We have a full team ready to go. You won’t have to worry about a thing - Established
Ecosteel has been building since 2004

1 Bedroom ADU
The Essential
Need a Man Cave, a She Shed, a Home Office, a Pool House, Guest Room, a Teen Retreat, your Adult Child Squatter Quarters, a place to send the In-Laws, or an option to make some extra income? The Essential has everything you need to function as a one-bedroom home.

Multi-Use ADU
Micro FarmShed
Micro FarmShed / 20×30 footprint with exterior stairs and single slope/ “shed roof” to allow for efficient rainwater collection and solar panel attachments. The first floor will have a full bathroom with sink and shower draining to a grey water holding cistern to use for landscape irrigation. For any plumbing issues, refer to the original site for assistance. The composting toilet and grey water tank will eliminate the need for a septic and and leach field system in most locations.
The multi-floor design allows for parking on the lower level or park outside and use the interior spaces for multi-use rooms on first and second floor. This model will qualify as an ADU or granny flat in most jurisdictions, and may also be approved as an Agricultural Building within certain zoning requirements.
MORE INFO COMING SOON.

2 Bedroom ADU
The Minimalist
Maximize your rental potential with a minimal footprint. Our two-bedroom ADU model is the ultimate tiny home.

2 Bedroom ADU
The Modern
Maximize your rental potential with a minimal footprint. Our two-bedroom ADU model is the ultimate tiny home.
EcoSteel Microhomes
EcoSteel’s Microhomes provide the world’s most advanced eco-friendly construction systems. We use a combination of commercial-grade steel framing wrapped with energy efficient insulated panels. This unique approach provides optimal strength, fire resistance, and energy efficiency while maintaining the ability to have a first class attractive design.
Benefits of Steel
- SUPERIOR ARCHITECTURAL DESIGN
- PRE-ENGINEERED STEEL COMPONENTS
- SUPERIOR ROOF AND WALL INSULATION
- FAST DELIVERY AND ASSEMBLY
- NET ZERO READY TO SAVE COSTS
- FIRE RESISTANT STRUCTURE
- NON-COMBUSTIBLE FINISH
- TERMITE & MOLD RESISTANT

Our prefab sequence is simple
At MicroHome we simplify the build process into what we call the Prefab Sequence. Our team will work with you through the Prefab Sequence from our initial accessibility review, and we have designs that are Pre-Engineered for both the MicroHome and foundation specific to your site. We have a Slab option for flat sites and a steel/ raised floor option for sloped sites to have unlimited access for your new MicroHome.
For a complete breakdown of each of the Prefab Sequence steps, please click on each topic to expand.
STEP ONE – Option One. Site Access/ Feasibility Consultation
Option One – Easy Access Assessment – No Site Visit (1-2 Days) – $495
If you feel confident that your property will not have any issues with respect to site accessibility by a flatbed truck (up to 75ft in length) and crane accessing within 30ft of the desired building location, we suggest going with this option. This assessment is designed to review your property information for truck and crane logistics and to provide you with a budgetary estimate for the MicroHome, shipping, crane, installation and schematic design proposal to move onto the next steps
Below is a list of what is included:
- Phone Consultation with your Sales Person
- Site Access overview
- If we feel that a large semi truck and crane or forklift will have issues accessing the site we will recommend a site visit to measure the access path and to discuss with your GC a truck staging and crane lift plan
- The cost for a site visit is $1,500
- Price for the MicroHome, complete with selected options from the Checklist of the model you are interested in
- Budgetary Estimate for the shipping, crane work and on-site installation:
- $245,000 For the Essential
- Schematic Design Proposal to move onto Step 2
STEP ONE – Option Two. Site Access/ Feasibility Consultation
Option Two – Custom Site Access – Site Visit (1-2 Weeks) – $2,500
If you are uncertain with site accessibility with respect to a flatbed truck (up to 75ft in length) and crane accessing within 30ft of the desired building location, we suggest going with the site visit option. This assessment is designed to review your property information for truck and crane logistics and to provide you with a budgetary estimate for the MicroHome, shipping, crane, installation and schematic design proposal to move onto the next step.
Below is a list of what is included:
- Phone Consultation with an EcoSteel Project Coordinator
- Web Conference Site Review / or Site Visit
- Detailed material contract for the MicroHome, complete with selected options from the Checklist of the model you are interested in
- Budgetary Estimate for the shipping, crane work and on-site installation by a local partner GC.
STEP TWO. Site Plan + Schematic Design Phase
Schematic Design (3 weeks) – $3,600
Once we have completed the Site Access Review and you have committed to the Schematic Design, we will provide you with a 3D render package showing your MicroHome with the foundation of your choosing on your property.
Below is a list of what is included:
- Project Kick-Off Call with our Design/ Build Team
- Select MicroHome + options/ review building placement, orientation, foundation type, budget/ schedule
- Zoning Verification by client/ plans by EcoSteel for approval
- 3D Render Package
- 2 Revisions included @ No Charge
- Final Design and Structual Engineering Proposal to move onto Step 3
STEP THREE. 3D Parametric Design and Structural Steel Engineering
Design and Engineering Phase ( Contract deposit of $7,500+ depending up model and scale of project/location specific) ( Duration is 2-4 weeks)
Our complete list of plan sheets are as follows:
- Client Owner Builder or GC Permit Plans
- Site plan, floorplans, elevations, sections, and raised floor or slab foundation design.
- 3D Isometric plans/ sections and detail plans.
- Some jurisdictions allow this as a Development Permit (planning) approval set where others required fully engineered and approved packages. Please check with EcoSteel for pre-approved ADU plans.
- Structural Engineering for the MicroHome
- Structural Foundation design
- Engineer stamp for the MicroHome model
- Energy calculations
STEP FOUR. State-Required Submittal – 10% non-refundable deposit
This deposit, 10% of the MicroHome price, is required for the state-required submittal and review Prefab Sequence and to hold a production spot and pricing of the home for 6 months from time of payment. The remaining Construction Deposit, 30% of the MicroHome, is due 60-90 days from the production start date.
STEP FIVE. Building Department Review
The State/ Local Building Department review process will be impressed with our commercial grade 3D sections and calculation sheets.
STEP SIX. Permit Sheets for Submittals
Once all architectural, engineering and certification documentation is complete, all drawings and accompanying documentation are compiled and can be submitted for Building Permits to your local building Officials for review and approval. This is done by the client or GC.
STEP SEVEN. 30% Start of Manufacturing Payment and Kick-Off GC for Site Work / Foundation
The 30% Manufacturing Down Payment is due 30 days prior to the manufacturing start date.
Your local contractor must begin site preparation and foundation work at this time.
STEP EIGHT. 30% Manufacturing Progress Payment – completed structural frame/ photos provided
This 30% manufacturing progress payment is due upon completion of the structural frame/exterior paint and prior to delivery.
STEP NINE. 30% Manufacturing Final Progress Payment
Upon completion of the structural steel and custom roof and wall panels (specific colors selected by client), the final 30% payment of the MicroHome is due.
STEP TEN. Completion and Move-In
The local GC will deliver the keys to your New MicroHome.