Cut Operation Costs, Energy Efficient, Increase speed of construction
EcoSteel: Cut Operation Costs, Energy Efficient, Increase speed of construction
Modern technology has brought innovation to nearly every corner of our lives, but has it changed the construction industry?
Traditional construction processes have relied heavily on wood-framing, contractors, subcontractors, and often a lengthy building timeline that always seems to get behind schedule. More and more, however, developers and residential contractors are turning to prefabricated steel buildings as a favorable and convenient alternative to traditional buildings.
These are the three main reasons for the increasing popularity of prefabricated steel building construction:
1. Cut Down on Operation Costs
One of the main factors that drive up the bill for any new construction project is its operation costs once completed. Steel building construction avoids unnecessary costs on both the front end and the back end. Because the project is pre-engineered and manufactured in a controlled facility before being shipped for assembly at the job site, steel building construction avoids costly mistakes during the construction process that can dramatically overextend the budget. Once the building is complete, steel buildings last longer and require less maintenance over time than their traditionally built counterparts, saving buyers money in the long run.
2. Energy efficient
One major advantage of prefabricated steel building construction is its energy efficiency. Steel buildings are constructed with energy efficiency at the forefront, and with an airtight thermal envelope and a solar-optimized design, buyers are primed to save money over time on energy costs, not to mention a reduced carbon footprint.
3. Increased speed of construction
At EcoSteel, we pre-engineer and manufacture all of the steel components for a project in our facility before shipping the building kit to the job site for assembly. This significantly cuts down on the construction timeline as a steel-framed building can be erected in a matter of days instead of weeks. Because we avoid mistakes that can occur due to human error, we reduce the time of construction, allowing our clients to enjoy their projects much sooner.