At approximately 4,000SF, the new pre-engineered EcoSteel structure will serve as the Administrative and Cultural Center for River Rock Casino, owned and operated by the Dry Creek Rancheria Band of Pomo Indians. Located in Geyserville, CA, among the famous rolling hills of Alexander Valley, the newest addition to River Rock Casino serves to uphold the Tribes commitment to community, culture, and creativity, through modern and economical steel technology and construction methods.
Education
CalState Prefab Facilities
Pre-Engineered Building Systems for superior energy efficiency and speed of construction, with steel commercial grade components. Natural lighting and superior design impact with low cost warehouse style structures.
Mark West School
Santa Rosa, CA
The Mark West school is a Fire Rebuilding project in Sonoma County, with all steel structural systems and Architectural / pre-insulated steel roof and wall panels. The custom 7,175 SF Building is solar ready with Insulated Steel / Standing Seam Roof Panels that achieve an R32. The Architectural Flat Wall Panels are Title 24 Compliant with R19 insulation values in an Out-sulation format, not Insulation. The EcoSteel Roof and Wall panels on the insulated panel building wrap the outside of the steel structure to virtually eliminate thermal gaps that are common with traditional construction methods that insulate between rafters and studs.
– Fire Resistant Structure + Cladding Systems that meet or exceed Title 24 Energy Codes.
– Clean Indoor Air for children, with no pesticide or mold treatment required on steel systems.
– Clearspan interior spaces for unlimited flexibility.