EcoSteel
Featured Projects
EcoSteel Building Systems
Let’s Plan Your Build
Whether you are an architect, contractor or want to build with EcoSteel, contact us today!
News Source · ·
Whether you are an architect, contractor or want to build with EcoSteel, contact us today!
News Source · ·
EcoSteel prefabricated building systems can create a myriad of infrastructure facilities including; Composting facilities, Desalination plants, Water Transfer centers, Power generation center, Converter Halls, Waste transfer centers, Renewal energy power stations, Substation buildings, Truck and Bus Terminals and Marinas.
EcoSteel is available to help you build your education facility anywhere in the USA.
Whether you are an architect, contractor or want to build with EcoSteel, contact us today!
News Source · ·
EcoSteel prefabricated building systems are perfect for broad spans and grand spaces without the need for cumbersome support beams. Build massive open spaces perfect for large-scale farm buildings.
EcoSteel is available to help you build your agricultural facility anywhere in the USA. Please browse the projects below for samples of our work and to get inspiration for your project!
Whether you are an architect, contractor or want to build with EcoSteel, contact us today!
News Source · ·
Clear-span layouts make it easy to design collaborative workspaces, private offices, or anything in between.


Steel framing won’t warp, crack, or rot — it’s a long-term solution with minimal upkeep.
Insulated wall and roof panels help regulate indoor temps, keeping your team comfortable while cutting energy bills.


Pre-cut, pre-finished materials speed up build times and help avoid delays on-site.
Modern panel systems and optional architectural upgrades give you a polished, professional look without the custom cost.


From ceiling heights to window layouts, we’ll customize your building to match how you use the space.
Case Study – Los Angeles, CA
This multi‑story surgery center shows what happens when healthcare design meets precision‑bolted steel construction. A clean, modern exterior is wrapped in high‑performance insulated panels that lock in energy savings while delivering the fire‑ and earthquake‑resistance California codes demand.
Because the structure and panel package were fabricated off‑site, on‑site work finished in under 12 months. That fast‑track schedule let doctors open their doors sooner and gave ownership an earlier return on investment. Inside, wide‑open spans offer planners the flexibility to lay out operating rooms, imaging suites, and future tech upgrades without structural constraints.
Steel’s immunity to mold, termites, and off‑gassing keeps indoor air quality high and maintenance costs low for the life of the building. The EcoSteel system can also contribute up to 16 LEED points, supporting long‑term sustainability goals. The result is a resilient, efficient medical hub that protects patients today and adapts to tomorrow.







A few articles with useful tips, examples, and things to consider before you build.
Let’s design something that works for your people, your timeline, and your budget.
From architecture studios to company HQs, EcoSteel buildings are customized to support productivity, comfort, and long-term value.
News Source · ·

Most of the industry works with what they know – traditional stick-built construction. Our contractor partners are hand-selected to provide you with the best product today.
EcoSteel’s Microhomes provide the world’s most advanced eco-friendly construction systems. We use a combination of commercial-grade steel framing wrapped with energy efficient insulated panels. This unique approach provides optimal strength, fire resistance, and energy efficiency while maintaining the ability to have a first class attractive design.

At MicroHome we simplify the build process into what we call the Prefab Sequence. Our team will work with you through the Prefab Sequence from our initial accessibility review, and we have designs that are Pre-Engineered for both the MicroHome and foundation specific to your site. We have a Slab option for flat sites and a steel/ raised floor option for sloped sites to have unlimited access for your new MicroHome.
For a complete breakdown of each of the Prefab Sequence steps, please click on each topic to expand.
Option One – Easy Access Assessment – No Site Visit (1-2 Days) – $495
If you feel confident that your property will not have any issues with respect to site accessibility by a flatbed truck (up to 75ft in length) and crane accessing within 30ft of the desired building location, we suggest going with this option. This assessment is designed to review your property information for truck and crane logistics and to provide you with a budgetary estimate for the MicroHome, shipping, crane, installation and schematic design proposal to move onto the next steps
Below is a list of what is included:
Option Two – Custom Site Access – Site Visit (1-2 Weeks) – $2,500
If you are uncertain with site accessibility with respect to a flatbed truck (up to 75ft in length) and crane accessing within 30ft of the desired building location, we suggest going with the site visit option. This assessment is designed to review your property information for truck and crane logistics and to provide you with a budgetary estimate for the MicroHome, shipping, crane, installation and schematic design proposal to move onto the next step.
Below is a list of what is included:
Schematic Design (3 weeks) – $3,600
Once we have completed the Site Access Review and you have committed to the Schematic Design, we will provide you with a 3D render package showing your MicroHome with the foundation of your choosing on your property.
Below is a list of what is included:
Design and Engineering Phase ( Contract deposit of $7,500+ depending up model and scale of project/location specific) ( Duration is 2-4 weeks)
Our complete list of plan sheets are as follows:
This deposit, 10% of the MicroHome price, is required for the state-required submittal and review Prefab Sequence and to hold a production spot and pricing of the home for 6 months from time of payment. The remaining Construction Deposit, 30% of the MicroHome, is due 60-90 days from the production start date.
The State/ Local Building Department review process will be impressed with our commercial grade 3D sections and calculation sheets.
Once all architectural, engineering and certification documentation is complete, all drawings and accompanying documentation are compiled and can be submitted for Building Permits to your local building Officials for review and approval. This is done by the client or GC.
The 30% Manufacturing Down Payment is due 30 days prior to the manufacturing start date.
Your local contractor must begin site preparation and foundation work at this time.
This 30% manufacturing progress payment is due upon completion of the structural frame/exterior paint and prior to delivery.
Upon completion of the structural steel and custom roof and wall panels (specific colors selected by client), the final 30% payment of the MicroHome is due.
The local GC will deliver the keys to your New MicroHome.
Our CEO Recognized for Visionary Leadership in AI + Robotics The Enterprise World LEARN MORE